Inground Pool Construction - Perimeter Concrete Footer
Following are some general photographs dealing with pouring the concrete footer around the outside of the inground pool wall system. This should ONLY be done once the pool is within 1/4" of being level at any point around the pool and the pool firmly secured in place with drive stakes and other material. It may be necessary to use hand mixed bags of concrete to initially and securely secure the pool walls for the perimeter pour.
|
|
|
|
|
|
|
4. This picture shows the pipe which will go to the main drains surrounded by concrete. This pipe is tunneled under the pool wall and once the footer is poured it's secure. Also notice in the lower left hand part of the picture the grounding wire which is secured to the pool wall under the concrete. An electrical rough inspection was done prior to pouring the footer. |